BABYLON POWER SOLUTIONS is a dynamic company that specializes in the Power Quality problems & Solutions.
We offer a complete package of solutions for Data centers, ICT rooms, telecommunications facilities, hospitals, Industrial and oil & gas sites. These solutions incorporate a combination of various components, including UPS systems, standby generators, ATS, switchgears, capacitor banks, 19” enclosures, data cables, patch panels, PDU, patch cables, fiber optics cable, wall outlet, remote monitoring, and cooling units.
BABYLON POWER SOLUTIONS is a full service oriented company. We provide power protection solutions with highest standards of quality, commitment and excellence.
We are available 24 hours a day, 7 days a week in order to offer fast and reliable service for all major UPS and generator brands.
No matter what the symptoms of the power quality problem you have, we have some of the most experienced power qaulity engineers in Iraq.
Our field service engineers are certified and factory-trained.
We provide site surveys to clients across Iraq. Our reports and recommendations cover all the essential areas required to ensure you can implement the most optimized power continuity plan for your site.
The survey is essentially part of a gap analysis and our subsequent report and recommendations will help to identify how you can optimize your power and energy management.
The initial site survey can be done free of charge service for our potential customers.
A UPS & standby diesel generator need to be properly installed and commissioned to ensure a long and trouble-free working life. While small, less sophisticated UPS systems simply plug into a standard mains socket, larger UPS systems (typically over 5kVA) must be electrically installed and commissioned by skilled and qualified service engineers. Likewise with generators – larger standby generator systems, typically over 10kVA, needed to professionally installed and commissioned. Additionally, a generator must be properly matched with all other power equipment for continuous power to be guaranteed.
Our projects manager will work closely with you, from start till finish, ensuring your UPS systems & generator are installed and commissioned safely, on time and with minimal disruption to your business. We offer full project management support, and will carry out a full site assessment including access, space and floor loadings. We’ll then arrange delivery and placement, arranging special lifting and craneage whenever needed.
Our factory trained, highly skilled field-service engineers will then commission and test the complete power protection system. They work in accordance with factory-issued commissioning procedures and written method statements and provide full commissioning certification for warranty validation.
At Babylon Power Solutions we have set our services range to provide a full turn-key power solutions package, while allowing clients and partners to select only those services that they require. The two most important services to ensure a “clean install” are electrical installation and commissioning, both of which may require certificates to be issued before a system can be made “live”.
Our power quality experts can organize a complete assessment of the building incomer and existing single and three phase supplies, distribution and cabling.
All works (including UPS, generator and associated electrical switchgear installation) are carried out subject to quotation by one of our approved partners and installations are tested to the highest standards before certification and handover.
UPS and generator commissioning can be more than a simple switch on process. For complex systems it can involve an inspection of connections, peripherals, inside-the-box components, firmware matching, configuration and final setup and test prior to switch-on. Commissioning is therefore a “boot-up” process that relies on every assembly being ready to perform its role within the UPS system. Only then can a system be started and the training and handover begin to the site representative.
UPS up to 3kVA with plug and socket connections are user-commissionable. Hardwired systems and larger systems will require connection to the electrical supply and commissioning by suitable qualified and certified personnel.
Most UPS and generator manufacturers may void their warranty terms if one of their systems is not commissioned by a certified engineer. This is especially clear where the commissioning engineer has to have access to a manufacturer’s dongle and communications software. Other UPS or generator systems may operate an “open protocol” with widely accessible passwords but even here they may reserve the right to cancel their warranty obligations if the UPS system has not been commissioned correctly.
As part of our commissioning service load bank testing can be supplied. The use of load banks provides a thorough testing of the UPS battery to support its load (runtime field test). Where a UPS or generator system is decommissioned, Babylon Power Supply can organize its removal and environmental disposal as part of our removal and recycling service.
Regarding existing UPS Installations, many UPS sites may operate a number of UPS brands and require advice on how to optimize their power protection systems. Babylon Power Solutions can advise on a range of aspects including: UPS Age and History: battery, capacitor and fan replacement issues and costs. Environmental Impact: electrical efficiency, heat output considerations and battery management versus the latest technologies. UPS Sizing and Efficiency: including actual system loading and potential for system expansion. Potential Savings: for an optimized maintenance and service plan.